SPS5000X series service manual
Chapter 2 Performance Verification
This chapter mainly describes how to test and verify whether the relevant
indicators of the verification power supply meet the specifications. To ensure
the accuracy of the measurements, preheat all instruments for 30 minutes.
Here are the equipment needed to perform the test:
Table 2-1 equipment required for test:
description
specification
example
Digital multimeter
6-digit half precision
Electronic load
Voltage and current power
is greater than the power
supply parameters
Connection cable
Power supply cable
Adjustable transformer
80V-240V
voltage
adjustable
Oscilloscope
SDS3022
The following is a schematic diagram of the connection between the electronic
load and the power supply under test:
Figure 2-1 Connect the test equipment
Testing report
In order to verify that the test results meet the specifications, please record the
test data in the test report in time.