- 24 -
•
Spout should be under ceiling of room, led out on roof at least 1,5 m
•
Ventilation duct should be made from incombustible material
7.4)
Chimney connection:
•
Flues should be made in accordance with current regulations.
•
To reduce the resistances of flow of flue gases the connection with chimney
should be led in straight line and possible change of direction should be made
with gentle arcs.
•
Boilers can be assembled into flues from brick with aligned internal welds
•
Combustion duct should begin from floor line
•
About 30cm. over floor should be to situated cleanout with tight lock
•
Intersection should be
approximate to square with
regard on smaller
resistances of flue gases
flow
•
The minimum intersection
of chimney amounts 20 x
20 cm
•
The dams of brick between
duct and wall should not be
smaller than 12cm
•
Chimney should be led out
over roof
•
The location of chimney
outlet depends from the
degree of roof droop and
stages of the flammability.
The roof with angle of
droop to 12º - the chimneys
should stand over roof ridge
0.6m, roof with angle of
droop over 12º - the
chimneys should stand over
roof ridge in case of easily
flammable coverings 0,6m however in case of incombustible or difficultly
flammable covering, the outlet can occur 0,3m over roof ridge.
•
Assembly of draught regulator is recommended, which in case of too big
underpressure in chimney opens and suck in the air from the boiler room and
does not pull it through boiler causing the temperature uncontrolled rise.
Interrupter this should be set on required value in dependence from power of
boiler
Summary of Contents for Holzgas
Page 25: ... 25 8 Parts ...
Page 28: ... 28 ...
Page 30: ... 30 ...
Page 31: ... 31 ...
Page 32: ... 32 ...