2
INSTALLATION
S I M O N E
STAINLESS STEEL BATHTUB
SKU: 934591, 912095
3. When the �oor is �nished, measure and cut the
drain pipe to the appropriate length for the type of
drain that is being used.
4. Carefully set the tub in position. If the tub has
leveling feet, adjust as necessary until level and apply a
generous bead of silicone under each foot. If your tub
does not have leveling feet, shims can be used for
leveling if your �oor is not �at.
1. Set the tub in the desired installation location and
mark the drain hole location on the �oor,
2. Move the tub away from the installation location so
that plumbing can be installed. The drain pipe should
extend approximately 6" above the �nished �oor.
6
inches