IOB / IOM / IO3
Installation
Technical changes reserved
- 13 -
3 Installation
The measuring point must be in the middle of
the pipe.
Immersion tubes that are too short or too long
will result in an incorrect temperature reading.
When using insulation, make sure that the im-
mersion pipe is long enough.
1. Sealing
2. Insert immersion tube
3. Tighten immersion tube
1a Flat gasket
1b
1b Sealant
(e. g. Teflon, hemp, …)