11
INSTALLATION
Choose installation position,
observe required minimum
distances.
Fix drilling template (D) to
the wall, drill holes.
Insert dowels (C).
Position bolts (B) into the
bowels. Fasten bolts.
The bolts should extrude about
0.5 cm from the wall.
Suspend infra red hot plate
(A).
Connect plug with socket.
Remove plug from socket, if
the device is not in service.