Powering Server On and Off
007-4653-001
9
Preparing to Power On
To prepare to power on your server, follow these steps:
1.
Check to ensure that the cabling between the power distribution unit (PDU) and the
wall power-plug receptacle is secure.
2. For each individual brick that you want to power on, make sure that the
PWR
(power) switch is set to the
1
(on) position, as shown in Figure 1-2. When the power
switch is on and power is supplied to the brick, the L1 controller of the brick powers
on. The 12-VDC LED of the brick illuminates green when 12 VDC is present.
Figure 1-2
Cx-brick Power Switch
PWR
Power
OK
O I
Console
L1
Port
NUMAlink 1 Port A
D
C
B
A
NUMAlink 8 Port H
NUMAlink 7 Port G
NUMAlink 6 Port F
X
I
O
1
X
I
O
2
X
I
O
3
X
I
O
0
NODE 3
NODE 2
NODE 1
NODE 0
Electrical
Rating
48 VDC 34.0 A
12 VDC 20 A
Router
Inlet Brd
12 V
48 V
3
2
1
0
D
C
B
A
N2
N3
INT LINK
N1
N0
Power switch on
Summary of Contents for Origin 3900
Page 1: ...SGI Origin 3900 Server User s Guide 007 4653 001 ...
Page 3: ...007 4653 001 iii Record of Revision Version Description 001 October 2003 Original Release ...
Page 4: ......
Page 12: ......
Page 18: ......
Page 62: ......
Page 65: ...Product Description 007 4653 001 39 Figure 2 1 512 processor Origin 3900 Server ...
Page 76: ......
Page 104: ......
Page 120: ......
Page 172: ......
Page 198: ......
Page 208: ......
Page 254: ......
Page 274: ......
Page 292: ......