6
• Ensure that the packing foil does not
become a deadly trap for a child.
Packing foils are not toys.
5. Unpack and set up
5.1 Assemble appliance
Before the appliance can be started up,
stand
8
needs to be screwed on.
1. Take the appliance out of the
packaging.
2. Remove the transport packaging.
3. Check that the appliance has not
sustained any damage.
4. Put rear half of the stand
10
and front
half of the stand
11
together.
Note
You can recognize rear half of the
stand
10
by the depression for power
supply cable
9
.
5. Use screw ring
12
supplied to screw
stand
8
to the underside of the tower
fan.
Notes
– On delivery, screw ring
12
is screwed
onto the bottom of the tower fan.
– Ensure that power supply cable
9
is
located in the depression provided for it.
– Tighten screw ring
12
hand-tight. Do
not use a tool.
6. Select a location in line with the safety
instructions (see “4. Safety instructions”
on page 4).
7. Plug the power plug into a power supply
socket which meets the technical data
requirements.
6. Operation
6.1 Start and switch off the appliance
1. Plug the power plug into a power supply
socket which meets the technical data
requirements (see “3. Technical data”
on page 4).
2. Switch on the power
supply by turning rotary
switch
2
to "
ON
".
The appliance is now operational.
RP86188 Tower-Ventilator LB4 Seite 6 Freitag, 11. Januar 2013 3:04 15