42C Getting Familiar - 16
To your lower left is the Refrigerator/
Freezer Unit. Above that is a 120 Volt
Outlet. Going forward is 4 sliding drawers.
Above the drawers is a pantry cabinet.
At the end of the passageway are three
doors. The port door is access to mid-
stateroom. The center door is access to
the forward stateroom. The starboard door
is access to the head.
HEAD
Standing in the Passageway, looking
through the doorway into the head, to the
right is the toilet paper roll holder. On the
same wall and a little higher is the towel
rack. Further on the bulkhead, toward
the outside bulkhead is the exhaust vent.
Looking down you will see your toilet.
On the outside bulkhead is the porthole.
Forward of the porthole is a cabinet with
a mirrored door. Below the shelf and the
cabinet is a wide storage cabinet with
two sliding doors. On the counter forward
is the sink. Forward of the sink on the
bulkhead is a 120 Volt Outlet. Under the
counter you have a large storage cabinet
with 2 doors. To the left of the cabinet are
the switches for the exhaust fan and the
lights.
On the forward bulkhead is a towel rack
and the A/C Outlet Vent. The door to your
left is access to the Forward Stateroom.
There is a clothes hook on the door.
Summary of Contents for 42 C
Page 1: ......
Page 6: ...INTRODUCTION 6...
Page 8: ...INTRODUCTION 8...
Page 12: ...INTRODUCTION 12...
Page 25: ...42C Getting Familiar 5 DECK...
Page 28: ...42C Getting Familiar 8...
Page 32: ...42C Getting Familiar 12...
Page 34: ...42C Getting Familiar 14...
Page 39: ...42C Getting Familiar 19 ENGINE COMPARTMENT...
Page 58: ...SAFETY 18...
Page 64: ...42C System Operations 6...
Page 66: ...42C System Operations 8...
Page 84: ...42C System Operations 26...
Page 86: ...42C System Operations 28...
Page 90: ...42C System Operations 32...
Page 94: ...42C System Operations 36...
Page 102: ...42C System Operations 44...
Page 104: ...42C System Operations 46...
Page 108: ...42C System Operations 50...
Page 118: ...42C System Operations 60...
Page 120: ...42C System Operations 62...
Page 122: ...42C System Operations 64...
Page 124: ...42C System Operations 66...
Page 128: ...42C System Operations 70...
Page 132: ...42C System Operations 74...
Page 134: ...42C System Operations 76...
Page 150: ...OPERATION 6...
Page 158: ...GLOSSARY 6...
Page 160: ...GLOSSARY 8...
Page 161: ...GLOSSARY 9 MAINTENANCE LOG DATE MAINTENANCE PERFORMED HOURMETER...
Page 162: ...GLOSSARY 10 MAINTENANCE LOG DATE MAINTENANCE PERFORMED HOURMETER...
Page 164: ...GLOSSARY 12...
Page 170: ...GLOSSARY 18...
Page 174: ......
Page 175: ......
Page 176: ......
Page 177: ......
Page 178: ......
Page 179: ......
Page 180: ......
Page 181: ......
Page 182: ......
Page 183: ......
Page 184: ...42 CONVERTIBLE DECK...
Page 185: ...42C...
Page 186: ......
Page 187: ......
Page 188: ......
Page 189: ......
Page 191: ......
Page 192: ......
Page 193: ......
Page 194: ...42 CONVERTIBLE INTERIOR...
Page 195: ......
Page 196: ...42 CONVERTIBLE Mechanical...
Page 197: ...42 Convertible Port Thru Hulls...
Page 198: ......
Page 199: ......
Page 200: ......
Page 201: ...42 Convertible Starboard Thru Hulls...
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......