2686
3
GB
3.
INSTALLATION
3.1 BOILER FIXING
➤
Put on the flange (1) the screw and two nuts, (see fig. 2).
➤
Widen, if necessary, the insulating gasket holes (5).
➤
Fix the flange (1) to the boiler door (4) using screws (2) and
(if necessary)
the nuts (3)
interposing the
insulating gasket (5)
, (see fig. 3).
Fig. 2
E9132
1
1
E9131
Fig. 3
4
3
2
2
5