79
IT
ENG
RUS
ES
SL
2 INSTALLATION
2.1
MOUNTING ACCESSORIES SUPPLIED SEPARATELY
A) Place the cast iron 1
st
deflector with the rear side supports
Fig. 2
Rear side supports
Fig. 3
1
st
deflector with the rear side supports
B) Place the cast iron 2
nd
deflector with the front side supports
Fig. 4
Front side supports
Fig. 5
2
nd
deflector with the front side supports
C) Place the remaining front lateral supports and insert the cement bricks
Fig. 6
Lateral supports
Fig. 7
Cement bricks
WARNING!
THE CEMENT BRICKS MUST BE ADJACENT TO THE FRONT PART OF THE BOILER
Summary of Contents for B-Essential Round 50
Page 1: ...B Home Round 25 B Essential Round 50 Fonderie SIME SpA Cod 6113743 07 2019 IT ES ENG RUS SL...
Page 2: ......
Page 42: ...42 1 9 8 20 20 1 10 6 DIN PLUS 25 3 650 5 8 1...
Page 44: ...44 1 12 1 2 3 4 5 10 90 C...
Page 46: ...46 2 6 EN IT ES FR DE o o o o 24 03 2015 o o o o 12 24 F C 12 24 F C...
Page 47: ...47 IT ES ENG RUS SL o o o o o o o o o 1 2 3 4 A B C D 1 2 3 4 5 2 7 00 00 2 H2O 10 90 C 1 7...
Page 64: ......
Page 89: ...89 IT ENG RUS ES SL 2 2 1 A 1 2 3 1 B 2 4 5 2 C 6 7...
Page 90: ...90 D 8 E F 1 5 9 A B C 10...
Page 108: ...108 NOTE...
Page 119: ......