Supplied By www.heating spares.co Tel. 0161 620 6677
Form
a
t 80 C:
Gas Council number 47-719-12
Form
a
t 100 C:
Gas Council number 47-719-13
Form
a
t 110 C:
Gas Council number 47-719-21
These appliances comply with the S.E.D.B.U.K. scheme, band “D”
SIME COMBINATION BOILERS
Installer checklist
Please remember to carry out the following checks after installation. This will achieve complete customer satis-
faction, and avoid unnecessary service calls. A charge will be made for a service visit where the fault is not due to
a manufacturing defect.
– Has a correct by-pass been fitted and adjusted?
– Has the system been flushed in accordance with the guidelines given in BS7593 “Treatment of water in domes-
tic hot water central heating systems”?
– Is the system and boiler full of water, and the correct pressure showing on the pressure gauge?
– Is the Auto Air Vent open?
– Has the pump been rotated manually?
– Is the gas supply working pressure correct?
– Is the boiler wired correctly? (See installation manual).
– Has the D.H.W. flow rate been set to the customer requirements?
– Has the customer been fully advised on the correct use of the boiler, system and controls?
– Has the log book provided been completed?
Please refer to commissioning instructions for filling in the log book
Note: All CORGI registered installers carry a CORGI ID Card.
You can check your installer is CORGI Registered by calling 01256 372300
IPX4D