Commissioning adjustments
Confirm the work carried out in the commissioning report shown below with a
=
or a
9
.
Commissioning works
Notes
Done
Check that the heating system has filled up adequately and has deaerated
Verify the fume exhaust system
Check that there are no leakages throughout the hydraulic circuit
Start the burner and check that it works efficiently
Measure the combustion parameters and record the fundamental data of the
initial start-up
Explain to the owner or to person in charge of the domestic system where the
burner is installed the importance of ensuring regular conditions for the entry
of combustion air and the expulsion of combustion by-products; in addition, they
must also point out that no modification can be made on the thermal machine
(consisting of the extraction system, heat generator and flue) that can alter the
system’s correct operation
Conformation of the correct commissioning:
Stamp / date / signature of the company: