82 | Setup at installation
Rudder test
To perform the Virtual Feedback rudder test you must be
able to view the movement of the engines/drives
(“rudder”).
Activate the automatic rudder test as shown, following
the instructions on the display.
Confirm by pressing the
softkey.
The next step is to enter the correct direction of the
rudder movement.
>3 sec.
If the rudder is not moving so as to give a starboard turn,
press the
softkey, and repeat.
When the rudder starts to move to starboard release and
press the
softkey to confirm.
Continue to follow the instructions on the display.
With the rudder hard over to starboard, turn the wheel
carefully a little to port to release the hydraulic pressure.
Confirm by pressing the
softkey.
Summary of Contents for AP28
Page 1: ...OPERATOR MANUAL AP28 AUTOPILOT 20222527 A Sw 1 1 English A P 2 8 ...
Page 6: ...6 AP28 Manual Blank page ...
Page 45: ...Operation 45 Blank page ...
Page 50: ...50 Operation Blank page ...
Page 68: ...68 Main menu Blank page ...
Page 101: ...Setup at installation 101 DISPLAY 1 DAMPING 1 LANGUAGE NONE FLYBRIDGE COCKPIT DISPLAY 2 ...
Page 104: ...104 Setup at installation Blank page ...
Page 108: ...108 IS20 Alarm system Blank page ...
Page 120: ...120 Optional equipment Blank page ...
Page 124: ...Glossary 124 Blank page ...