Turning on the entire system - Sonar room steps
When all cables have been properly connected, the SC90 can be started. In order to
power up the SC90 for the first time in a controlled manner, two tasks must be done
simultaneously. These tasks are done in the sonar room.
Prerequisites
The SC90 is installed as specified in the SC90
Installation manual
. All cables are
properly connected. The door on the Transceiver Unit is removed. The door on the
Motor Control Unit is open. You must be equipped with a standard set of tools. This tool
set must comprise the normal tools for electronic and electromechanical tasks.
Context
Certain steps in the two procedures are location specific. The steps marked [
Bridge
]
are done on the bridge.
Procedure
1
[
Bridge
] Make sure that the water depth under the keel permits you to lower the
transducer.
2
[
Bridge
] Turn on the SC90.
3
[
Bridge
] Lower the transducer to its middle position.
a
[
Bridge
] On the Operating Panel, press
Middle
.
b
When the transducer shaft stops, verify that the correct middle position has
been reached.
4
[
Bridge
] On the
Horizontal
menu, set
Range
to a suitable range.
5
[
Bridge
] Set
Mode
to
Bow Up
.
6
[
Bridge
] Start "pinging".
a
[
Bridge
] Set
TX Power
to
Low
.
b
[
Bridge
] Verify that echoes appear on the SC90 presentation.
c
Make sure that all the 16 transceiver boards are fully functional.
Each transceiver board is fitted with several LED indicators. To verify normal
operation, check the LED activity on all transceiver boards simultaneously.
During normal operation, they will behave nearly identical. If the LEDs on
one board act suspicious related to the other boards, you may have an error.
d
If possible, verify that you can hear the sound of the transmit pulse from the
transducer.
e
[
Bridge
] Set
TX Power
to
Medium
.
f
[
Bridge
] Verify that echoes on the SC90 presentation appear stronger.
g
If possible, verify that the sound of the transmit pulse is louder.
h
[
Bridge
] Set
TX Power
to
Maximum
.
Simrad SC90 Installation Manual
Summary of Contents for SC90
Page 2: ......
Page 16: ...14 419050 B Simrad SC90 ...
Page 219: ...419050 B 217 Øverland UPC 3005 Dimensions Cable layout and interconnections ...
Page 223: ...419050 B 221 Øverland UPC 5000P Dimensions Cable layout and interconnections ...
Page 438: ...436 419050 B 427177 Transducer dock dimensions page 494 Simrad SC90 Installation Manual ...
Page 441: ...419050 B 439 Drawing file ...
Page 442: ...440 419050 B Simrad SC90 Installation Manual ...
Page 445: ...419050 B 443 Drawing file ...
Page 452: ...450 419050 B Simrad SC90 Installation Manual ...
Page 455: ...419050 B 453 Drawing file ...
Page 458: ...456 419050 B Simrad SC90 Installation Manual ...
Page 463: ...419050 B 461 Drawing file ...
Page 468: ...466 419050 B Simrad SC90 Installation Manual ...
Page 469: ...419050 B 467 Related topics Installing the optional gate valve DN350 page 84 Drawing file ...
Page 471: ...419050 B 469 Drawing file ...
Page 473: ...419050 B 471 214043 Gate valve installation DN350 Drawing file ...
Page 475: ...419050 B 473 422915 Gate valve installation DN350 Drawing file ...
Page 477: ...419050 B 475 083045 Gate valve installation DN500 Drawing file ...
Page 479: ...419050 B 477 33414 Gate valve dimensions DN350 Drawing file ...
Page 480: ...478 419050 B Simrad SC90 Installation Manual ...
Page 481: ...419050 B 479 Related topics Installing the optional gate valve DN350 page 84 Drawing file ...
Page 482: ...480 419050 B 33473 Gate valve dimensions DN350 Simrad SC90 Installation Manual ...
Page 483: ...419050 B 481 Related topics Installing the optional gate valve DN350 page 84 Drawing file ...
Page 484: ...482 419050 B 33498 Gate valve dimensions DN500 Simrad SC90 Installation Manual ...
Page 485: ...419050 B 483 Drawing file ...
Page 487: ...419050 B 485 37357 Gate valve dimensions DN500 Drawing file ...
Page 488: ...486 419050 B Simrad SC90 Installation Manual ...
Page 489: ...419050 B 487 Related topics Installing the optional gate valve DN500 page 103 Drawing file ...
Page 491: ...419050 B 489 Drawing file ...
Page 494: ...492 419050 B Simrad SC90 Installation Manual ...
Page 495: ...419050 B 493 Related topics Installing the optional gate valve DN350 page 84 Drawing file ...
Page 497: ...419050 B 495 Drawing file ...
Page 542: ... 2018Kongsberg Maritime ISBN xxx ...
Page 543: ......
Page 544: ...Simrad SC90 Fish finding sonar Installation Manual ...