419050/B
311
i
[
Bridge
] Verify that echoes on the SC90 presentation appear even stronger.
j
If possible, verify that the sound of the transmit pulse is even louder.
7
[
Bridge
] Set
TX Power
to
Off
.
8
[
Bridge
] On the Operating Panel, press
Up
.
9
When the transducer shaft stops, verify that the correct middle position has been
reached.
10
[
Bridge
] Notify the sonar room that the test is finished.
11
Close the door on the Transceiver Unit.
a
Place the door on its frame.
b
Tighten the four bolts that secure the door.
12
Close the door on the Motor Control Unit. Use a spanner to secure it.
13
Close the Power Supply Unit.
Related topics
Turning on the entire SC90 system for the first time, page 307
Turning on the entire system - Preparations, page 307
Turning on the entire system - Bridge steps, page 308
Turning on the entire system - Sonar room steps, page 310
Turning on the SC90 for normal use
To turn on the SC90 use the
Power
button on the Operating Panel.
Context
The SC90 program starts automatically when the Processor Unit is turned on.
TX Power
is by default set to
Off
.
Caution
You must never start SC90 transmissions ("pinging") when the ship is in dry dock. The
transducer may be damaged if it transmits in open air.
Procedure
1
Make sure that the water depth under the keel permits you to lower the transducer.
2
Turn on the display.
If required, refer to the instructions provided by the display manufacturer.
Summary of Contents for SC90
Page 2: ......
Page 16: ...14 419050 B Simrad SC90 ...
Page 219: ...419050 B 217 Øverland UPC 3005 Dimensions Cable layout and interconnections ...
Page 223: ...419050 B 221 Øverland UPC 5000P Dimensions Cable layout and interconnections ...
Page 438: ...436 419050 B 427177 Transducer dock dimensions page 494 Simrad SC90 Installation Manual ...
Page 441: ...419050 B 439 Drawing file ...
Page 442: ...440 419050 B Simrad SC90 Installation Manual ...
Page 445: ...419050 B 443 Drawing file ...
Page 452: ...450 419050 B Simrad SC90 Installation Manual ...
Page 455: ...419050 B 453 Drawing file ...
Page 458: ...456 419050 B Simrad SC90 Installation Manual ...
Page 463: ...419050 B 461 Drawing file ...
Page 468: ...466 419050 B Simrad SC90 Installation Manual ...
Page 469: ...419050 B 467 Related topics Installing the optional gate valve DN350 page 84 Drawing file ...
Page 471: ...419050 B 469 Drawing file ...
Page 473: ...419050 B 471 214043 Gate valve installation DN350 Drawing file ...
Page 475: ...419050 B 473 422915 Gate valve installation DN350 Drawing file ...
Page 477: ...419050 B 475 083045 Gate valve installation DN500 Drawing file ...
Page 479: ...419050 B 477 33414 Gate valve dimensions DN350 Drawing file ...
Page 480: ...478 419050 B Simrad SC90 Installation Manual ...
Page 481: ...419050 B 479 Related topics Installing the optional gate valve DN350 page 84 Drawing file ...
Page 482: ...480 419050 B 33473 Gate valve dimensions DN350 Simrad SC90 Installation Manual ...
Page 483: ...419050 B 481 Related topics Installing the optional gate valve DN350 page 84 Drawing file ...
Page 484: ...482 419050 B 33498 Gate valve dimensions DN500 Simrad SC90 Installation Manual ...
Page 485: ...419050 B 483 Drawing file ...
Page 487: ...419050 B 485 37357 Gate valve dimensions DN500 Drawing file ...
Page 488: ...486 419050 B Simrad SC90 Installation Manual ...
Page 489: ...419050 B 487 Related topics Installing the optional gate valve DN500 page 103 Drawing file ...
Page 491: ...419050 B 489 Drawing file ...
Page 494: ...492 419050 B Simrad SC90 Installation Manual ...
Page 495: ...419050 B 493 Related topics Installing the optional gate valve DN350 page 84 Drawing file ...
Page 497: ...419050 B 495 Drawing file ...
Page 542: ... 2018Kongsberg Maritime ISBN xxx ...
Page 543: ......
Page 544: ...Simrad SC90 Fish finding sonar Installation Manual ...