SL 30/35 Hull Sonar Operators Manual
974-25007001/2.0
Installation, Start-Up and Test
Page 6.9
Kongsberg Simrad Mesotech Ltd.
Port Coquitlam, BC - Canada
When a retraction tank is constructed locally, finish it so that the welding beads do
not protrude on the inner surface of the tank. The tank guide may hit the bead. Also,
do not position the welding bead in the ship’s fore-aft line. The final stage, when
mounting the retraction tank, is to center any two bolt holes facing the ship’s bow.
See Part 8
“ Attachment and Drawing”
for detailed information.
Bow
Retraction Tank Flange
NOTE
Special attention must be paid to the safety (strength, water tightness) first,
followed by ease of maintenance and inspection.
6.4
ASSEMBLING THE FLANGE, SONAR DOME, SHAFT AND TANK GUIDE
The following paragraphs will describe the assembling of the tank flange, the sonar
dome assembly to the shaft and the tank guide.
6.4.1 Required
Tools
The necessary tools required to assemble the following items, are listed below:
•
Tank Flange:
Qty 2, 30mm wrench “Not supplied”
•
Shaft lock Nut
Qty 2, 60mm wrench “Not supplied”
•
Hoist Motor Clamp
Qty 1, 5/32 inch allen key “Supplied”
•
Ram Clamp Bracket
Qty 1, 3/16 inch allen key “Supplied”
•
Shaft V-guide and
Shaft Packing Retainer
Qty 1, 1/ 4
inch allen key “Supplied”
•
Tank Guide
Qty 1, 5/16 inch allen key “Supplied”
Summary of Contents for SL 30
Page 1: ...SL 30 35 HULL SONAR OPERATORS MANUAL 974 25007001 Issue 2 0 September 2003...
Page 2: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ......
Page 217: ......
Page 218: ......
Page 219: ......
Page 220: ......
Page 221: ......
Page 222: ......
Page 223: ......
Page 224: ......