8
2.4.2 Priority settings
This page is used to define the importance of individual heating circuits and thus the sequence, in
which they will be heated. If there is for example the demand to heat two different circuits, heating
starts with that one with a higher priority. The circuit with a lower priority will be heated only after
heating that one with a higher priority.
If some heating circuit has a zero priority, this circuit will be eliminated from the heating process.
Furthermore it is possible to define, where the heat from solar collectors should be directed.
Fig. 8: Priority settings
Description of icons:
Priority for domestic hot water (DHW tank).
Priority for heating water (HW tank).
Priority for swimming pool.
Summary of Contents for S-THERM+ SHP-140ERC
Page 2: ......