Step 3: Assemble Chassis  

Parts Involved

 

 

All parts assembled so far 

 

M4 x 10mm Fasteners x12 

 

Side Panels x2 

 

 

Step 4: Install Distribution Plate  

Parts Involved

 

 

All parts assembled so far 

 

M4 x 10mm Fasteners x4 

 

Distribution Plate x1 

 

M4 x 14mm Fasteners x6 

 

M4 Washers x4 

 

 

 

 

 

 
Attach the Bottom Panel and Top Panel to the Side 
Panels using 12x M4 x 10mm fasteners. Select your 
Side Panel orientation depending where you want 
the cable routing and pass-throughs to be. 

 

 

 

 

 
Attach the Distribution Plate to the Back Panel 
using x6 M4 x 14mm fasteners, then attach the 
Back Panel to the chassis using x4 M4 x10mm 
fasteners. 

Summary of Contents for Arterial

Page 1: ...vv Revision 1 0 ...

Page 2: ...vision 1 0 Page 1 Table of Contents Step 1 Install Feet 2 Step 2 Install Corner Pieces 2 Step 3 Assemble Chassis 3 Step 4 Install Distribution Plate 3 Side Panel Window Installation 4 Pressure Testing 4 Filling Draining The Loop 4 ...

Page 3: ... 4x M4 x 14mm M4 Nuts and M4 Washer Step 2 Install Corner Pieces Parts Involved Corner Pieces x4 Bottom Panel x1 Top Panel x1 M4 x 10mm Fasteners x8 Attach the Corner Pieces to the Top Panel and Bottom Panel using x8 M4 x 10mm fasteners x4 for each panel Take care that the orientation of the Corner Pieces are correct they are slightly longer on the side which the side panel window attaches to ...

Page 4: ...o far M4 x 10mm Fasteners x4 Distribution Plate x1 M4 x 14mm Fasteners x6 M4 Washers x4 Attach the Bottom Panel and Top Panel to the Side Panels using 12x M4 x 10mm fasteners Select your Side Panel orientation depending where you want the cable routing and pass throughs to be Attach the Distribution Plate to the Back Panel using x6 M4 x 14mm fasteners then attach the Back Panel to the chassis usin...

Page 5: ...5L of fluid but allow 2L We recommend air pressure testing before filling any loop Air pressure should not surpass 0 6 bar Use an external PSU for your pump or jump start your PSU Do not boot your system to fill the loop Fill the reservoir 100 and run the pump until the reservoir is almost empty do not run the pump dry Keep repeating until you have full circulation Give some time for the final air...