explosive gas.
Do not use the tools that may cause spark to
contact the storage battery terminals or cable
clips.
Hazard of Damaged Parts
Please use the charger appointed by the
manufacturer to charge the storage battery.
Hazard of Electric Shock
Only connect the charger to the grounded
three-wire AC power socket.
Check the wire for damage daily. Please replace
the damaged parts before operation.
Avoid electric shocks due to contact with
storage battery terminals and remove all rings,
watches and other accessories.
Hazard of Tip-over
Do not use the storage battery with weight
lighter than that of the original one. The storage
battery not only provides power but also serves
as balance weight, which is vital to the machine
stability.
For: GJZ0608, GTJZ0808, GTJZ0612,
GTJZ0812, GTJZ1012
The weight of each storage battery must reach
28kg.
For GTJZ1212
The weight of each storage battery must reach
33kg.
Hazard during Lifting
During lifting the storage battery, please use the
appropriate number of people and lifting
methods.
Pre-operational Inspection
Do not operate, unless:
You have mastered and practiced the safe
machine operating rules stated in this Manual.
1 Avoid dangerous situations.
2 Always perform the pre-operational
inspection.
Learn and understand the above rules before
continuing the next step.
3 Always perform pre-usage functional tests.
4 Check the workplace.
5 Use the machine only according to the
machine design intention.
Basic Principles
It is the operator’s responsibility to perform the
“pre-operational inspection” and routine
maintenance.
The
pre-operational
inspection
is
a
straightforward inspection procedure performed
by the operator before each shift change, and it
aims to find out whether the machine has
obvious problems before the operator performs
functional tests.
The pre-operational inspection can also be used
14
GTJZ0608 & GTJZ0808 & GTJZ1012 & GTJZ1212 & GTJZ0612 & GTJZ0812
Operation Manual
Summary of Contents for GTJZ0608
Page 31: ...29 GTJZ0608 GTJZ0808 GTJZ1012 GTJZ1212 GTJZ0612 GTJZ0812 Operation Manual ...
Page 32: ...30 GTJZ0608 GTJZ0808 GTJZ1012 GTJZ1212 GTJZ0612 GTJZ0812 Operation Manual ...
Page 33: ...31 GTJZ0608 GTJZ0808 GTJZ1012 GTJZ1212 GTJZ0612 GTJZ0812 Operation Manual ...
Page 35: ...33 GTJZ0608 GTJZ0808 GTJZ1012 GTJZ1212 GTJZ0612 GTJZ0812 Operation Manual ...
Page 36: ...34 GTJZ0608 GTJZ0808 GTJZ1012 GTJZ1212 GTJZ0612 GTJZ0812 Operation Manual ...
Page 37: ...35 GTJZ0608 GTJZ0808 GTJZ1012 GTJZ1212 GTJZ0612 GTJZ0812 Operation Manual ...