179948GRY
179947GRY
179720GRY
Leave this connection
loose until the slide
tubes are installed.
42', 56' TRUSS WALL BUILDING
MAIN AWNING TUBES INSTALLATION
Attach the 172320GRY Lower Mount Tubes to each Corner outer tube by drilling a 7/16 hole
and secure with 3/8 x 3-1/2 bolts and nuts.
Attach the Lower Mount Tubes to each 179947GRY, 179948GRY, and 179720GRY Awning
Tubes with 3/8 x 1 bolts and nuts.
Attach the other end of the Awning Tubes to each Rafter upper tube by drilling a 7/16 hole
and secure with 3/8 x 3-1/2 bolts and nuts.
After the last Awning Tube is attached to the Rafter, remove the 3/8 x 1 bolt from the end
connection until the Awning Slip Tubes are installed per the next step.
Secure End Tubes and Center
Tubes to Lower Braces with
3/8 x 1 bolts and nuts.
with a 3/8 x 3-1/2 bolt and nut.
Drill a 7/16 hole through the
Corner outer tube and secure
172320GRY
Drill a 7/16 hole throuigh
the Rafter upper tube and
secure with a 3/8 x 3-1/2
bolt and nut.
30