6
GENERAL INFORMATION
The Sioux Steel Manual Head Gate has been completely assembled at the factory.
Before operating Head Gate, verify that the shipping plug has been removed from the top chamber of
cylinder and that the breather vent is installed. Also, verify that all shipping material has been removed
from head gate.
Grease the 4 grease zerks found on the linkage rod ends. Oil all other hinged and moving parts.
Before operation of head gate, cycle the head gate at least 10 times, ensuring to stop for 5 seconds
between opening and closing and each cycle. Then with the head gate closed, manually attempt to open
the head gate doors. The opening at the top of the doors should never exceed ¾”.
Grease and oil as needed.
WARNING! Keep hands and fingers away from all hinged
and moving parts during operation.
Summary of Contents for S202800
Page 2: ...2...
Page 8: ...8 See next page for linkage breakdown and details Front View showing short linkage connection...
Page 9: ...9 Rear View of Doors showing short linkage connection...
Page 11: ...11 See next page for linkage breakdown and details Front View showing short Linkage connection...
Page 12: ...12 Rear View of Doors showing short linkage connection...
Page 18: ...18...
Page 21: ...21...