Fig. 8
3.1.5. Installation Positions of the Xroom Unit
-
All the Xroom unit types can be installed in the following position:
-
Any other position is prohibited
2. Xroom Unit Installation
-
The unit must be operated in enclosed and dry areas with room temperature ranging b5 °C and
+30 °C.
-
The recovery unit must be installed in accordance with the general and local safety regulations.
-
The recovery unit may be installed, connected, commissioned, and repaired by a person with adequate
education, experience, and knowledge of applicable regulations, standards, and potential risks and
hazards, or by a properly trained service technician.
-
Failure to follow the installation procedure may result in the unit's damage or malfunction, or potential
harm to the health and property of the user.
-
Take special care when draining the condensate using a condensation sump (not a part of the supply)
into the sewerage piping. The unit manufacturer accepts no liability for damage caused by incorrect
installation of the condensate sump, drain piping, and other peripherals required for their operation.
3.2.1. Installation Components Required for Installation of the Xroom Unit
-
Prepare the auxiliary installation material for the installation of the unit:
o
Anchoring elements (e.g. dowels, dowel bolts). The diameter of the holes in the installation
template is 7 mm.
Xroom 100 (XR1-010…)
Xroom 250 (XR1-025…)
o
MS polymer based sealant
o
Low-expansion installation foam with an adapter according to wall thickness (e.g. tube)
7 pc
8 pc
1 pc
1 pc
-
The installation accessories supplied together with the unit are intended for installation on the wall with
the maximum thickness of 500 mm.
22
Version 1 – GBR(23/06/2021)
D-502-0152