1 Preparations
Sirona Dental Systems GmbH
Installation Requirements C5
+
, C5
+
Turn
60 27 978 D3415
12
D3415.021.03.08.02
Important information for the installer
Depending on the prevailing local conditions, the existing
cable set can be installed in the cable duct of an underfloor
installation by an installer prior to the installation of the
treatment center. In this case, please observe the following:
Proceed with
extreme care
when running the cables. Par-
ticularly cables
L15
and
L38
are very sensitive, and must
never be kinked or twisted. The cables must
not overlap or
cross one another
.
RS232 (
L37
) and the XGA cable (
L38
) are not yet cut to
length and terminated on the PC side. It would be impossi-
ble to pull the cables through when installing them under
floor level if a sub D connector were already connected.
These cables should always be pulled.
Free length
A
of cables at the treatment center end:
Length
A
= 600mm
If S video cable
L15
is equipped with both a female and a
male connector, make sure that the female connector
(socket) points to the connection box of the treatment cen-
ter.
1.
Bend the wire at the front end of cables
L37
and
L38
to
form a hook.
2.
Pull cables
L15
,
L37
,
L38
and the grounding cable of
the treatment center through the cable duct to the loca-
tion of the PC.
Save the accessory parts for final installation!
1.5 Underfloor installation of SIVISION connections
2.
A
SIVISION
1.
L15, L37, L38,
Protective earth conductor