61 93 556 D3509
D3509
.
201.01.02
.
02
19.09.2008
32
Sirona Dental Systems GmbH
4 Operation
Operating Instructions TENEO
Starting up the treatment center
4
Operation
4.1
Starting up the treatment center
4.1.1
Initial startup
Sanitation must be performed prior to initial startup of your treatment center.
This is done by filling all water-bearing lines with a concentrated disinfectant
to reduce the exposure of the water to bacteria.
If the service engineer skipped the sanitation procedure after installing your
treatment center based on an agreement with you or sanitation has not been
performed for more than one week, please perform sanitation yourself. Refer
to "Sanitizing the treatment center" [
for more information.
Sanitation takes approx. 24 hours.
4.1.2
Switching the treatment center on/off
The treatment center is equipped with a standby system for enhanced
convenience when switching it on and off.
The treatment center thus features a power switch at the base of the chair and
a main switch on the dentist element.
4.1.2.1
Power switch
The power switch connects the treatment center to the power supply. During
longer periods of disuse, the treatment center should be disconnected from
the power supply. It then no longer consumes any energy.
The power switch contains an automatic device fuse.
Connecting the treatment center to the power supply
9
The treatment center is installed according to the "Installation
Instructions" by authorized technical personnel.
¾
Turn on power switch
A
.
ª
The treatment center is connected to the power supply.
Disconnecting the treatment center from the power supply
9
The treatment center is shut down, see "Switching the treatment center
off" (below).
¾
Turn power switch
A
off.
ª
The treatment center is disconnected from the power supply.
4.1.2.2
Main switch
Switching the treatment center on
The main switch switches the treatment center from the Standby mode to
operational readiness.
Following switch-on, the operating system is booted and an automatic self-
test is performed.
ON
OFF
A
Max.6A
FuseT6.3AH
250~
WA
TER
A
IR