Make sure that during the installation and removal of the device the
installation is basically cordoned off. This also applies to implementation of service.
The device has to be protected by a suitable safety cord.
Make yourself familiar with the functions of the device before start
should not handle the device. The most cause of functional disorder is inappropriate handling.
Use the original packing or designated accessory for transport to avoid damages.
For reasons of safety unauthorized changes are forbidden.
A usage of the device which differs from usages which are described in this manual can cause
damages of the device. In that case the warranty expires. Additional you should notice that every
differed usage is related with dangers and can cause e.g. an elec
crash.
1.4. Overhead installation
Danger of life!
You have to observe the regulations of BGV C1 (formerly VBG 70) and
EN60598-2-17. If there are more regulations for the area of designated use
they have to be adhered,
skilled personnel only.
The suspension devices have to be build and measured so they can withstand the tenfold of the
payload for one hour without suffering a permanent detrimental deformation.
Basically installation has to be done by using a second separate suspension. This can be e.g. a
suitable net. The second suspension must be designed and attached so no part of the installation can
fall down in case of failure.
During construction, reconstruction and d
areas, on lightning bridges, under elevated work stations or any other danger zones is forbidden.
The operator is obliged to following safety
•
Before the first start-up or after critical changes before restarting it has to be checked by an
expert.
•
Review in the frame of the inspection test at least all four years by an expert. .
•
Review by a qualified person at least once a year.
How to carry out the overhead installa
If possible you should install the device out of areas where people are able to stay.
IMPORTANT! Overhead installation requires a high level of experience. This includes knowledge of
calculating the payload, used installation material and safety insp
projector whereas the required experience is not limited to this. Do not try to carry out installation
yourself under any circumstances if you are not qualified. Contact a qualified installer. An
inappropriate installation can lead to injuries and/or damaged properties.
It is not allowed to install the device in the grip area of people.
If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory.
The device may not be installed so it
5 / 8
Make sure that during the installation and removal of the device the area below the place of
installation is basically cordoned off. This also applies to implementation of service.
The device has to be protected by a suitable safety cord.
Make yourself familiar with the functions of the device before start-up. People witho
should not handle the device. The most cause of functional disorder is inappropriate handling.
Use the original packing or designated accessory for transport to avoid damages.
For reasons of safety unauthorized changes are forbidden.
A usage of the device which differs from usages which are described in this manual can cause
damages of the device. In that case the warranty expires. Additional you should notice that every
differed usage is related with dangers and can cause e.g. an electrical short, fire, electric shock or
Overhead installation
Danger of life!
You have to observe the regulations of BGV C1 (formerly VBG 70) and
17. If there are more regulations for the area of designated use
they have to be adhered, too. Therefore installations are to carry out by
skilled personnel only.
The suspension devices have to be build and measured so they can withstand the tenfold of the
payload for one hour without suffering a permanent detrimental deformation.
stallation has to be done by using a second separate suspension. This can be e.g. a
suitable net. The second suspension must be designed and attached so no part of the installation can
During construction, reconstruction and deconstruction unnecessary stay in the range of moving
areas, on lightning bridges, under elevated work stations or any other danger zones is forbidden.
The operator is obliged to following safety-related and mechanical facilities:
up or after critical changes before restarting it has to be checked by an
Review in the frame of the inspection test at least all four years by an expert. .
Review by a qualified person at least once a year.
How to carry out the overhead installation:
If possible you should install the device out of areas where people are able to stay.
Overhead installation requires a high level of experience. This includes knowledge of
calculating the payload, used installation material and safety inspections of the used material and the
projector whereas the required experience is not limited to this. Do not try to carry out installation
yourself under any circumstances if you are not qualified. Contact a qualified installer. An
ion can lead to injuries and/or damaged properties.
It is not allowed to install the device in the grip area of people.
If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory.
The device may not be installed so it can swing freely in the room.
area below the place of
installation is basically cordoned off. This also applies to implementation of service.
up. People without the experience
should not handle the device. The most cause of functional disorder is inappropriate handling.
A usage of the device which differs from usages which are described in this manual can cause
damages of the device. In that case the warranty expires. Additional you should notice that every
trical short, fire, electric shock or
You have to observe the regulations of BGV C1 (formerly VBG 70) and
17. If there are more regulations for the area of designated use
nstallations are to carry out by
The suspension devices have to be build and measured so they can withstand the tenfold of the
stallation has to be done by using a second separate suspension. This can be e.g. a
suitable net. The second suspension must be designed and attached so no part of the installation can
econstruction unnecessary stay in the range of moving
areas, on lightning bridges, under elevated work stations or any other danger zones is forbidden.
up or after critical changes before restarting it has to be checked by an
Review in the frame of the inspection test at least all four years by an expert. .
If possible you should install the device out of areas where people are able to stay.
Overhead installation requires a high level of experience. This includes knowledge of
ections of the used material and the
projector whereas the required experience is not limited to this. Do not try to carry out installation
yourself under any circumstances if you are not qualified. Contact a qualified installer. An
If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory.