8
4.
UV Chamber Installation
4.1.
4.1 Assembling of the UV chamber
4.2.
4.2 Detailed drawing of the UV-C chamber
5.
Models drawing
Inserire la lampada UV-C nella guaina
Collegare il quadripin elettrico
Inserire la calotta PVC copricontatti.
Avvitare il bloccaguaina in nylon
Inserire la molla di appoggio della lampada nella guaina al quarzo
Insert the quartz sleeve paying attention in centering the guide spring placed
ASSEMBLING OF THE UV-C CHAMBER
Insert the O-RING on the sleeve
on the bottom of the chamber
Unscrew the nylon sleeve bolt
Extract the PVC contact cover
Summary of Contents for 405 AL2
Page 8: ...7 3 1 3 1 Installation scheme recommended ...
Page 12: ...11 5 Models drawing ...
Page 13: ...12 ...
Page 14: ...13 6 Electrical scheme ...