8 Bringing up the WL-612
Connect the supplied power-adapter to the power inlet port and connect it to
a wall outlet. The WL-612 automatically enters the self-test phase. During
self-test phase, the Power LED will blink briefly, and then will be lit
continuously to indicate that this product is in normal operation.
9 Initial Setup WL-612
LOGIN procedure
2. OPEN your browser (e.g. Internet Explorer).