26
MAINTENANCE POINTS
Number Q.ty Description
Operation
Every hours
Product to be
used
Notes
1
1
Bracket
Greasing
20
Grease
2
6
Gearbox
Greasing
40
Grease
3
1
Central housing
Greasing
80
Grease
A
4
1
Shaft
Greasing
Grease
B
5
4
Universal joint
Greasing
8
Grease
6
1
Adjustment support
Greasing
20
Grease
7
4
Pin
Greasing
50
Grease
8
10
Tyres
Check
pressure
Compressor
C
45 psi
9
2
Axle tandem
Greasing
20
Grease
10
1
Cardan shaft
Greasing
8
Grease
11
6
Rotor hubs
Greasing
24
Grease
12
8
Swivel hinge pin
Greasing
40
Grease
1
Cardan shaft
Greasing
8
Grease
General checking of bolts, security pins and split pins to be carried out initially after the first 8 hours
of use. Subsequently every 50 hours and whenever the machine is laid up for extended periods.
A = The complete lubrication of housing 1 is done the first time at the manufacturer’s plant, after
which it must be topped up periodically, as according to the lubrication points table. A complete
change or fill is necessary only for the replacement and /or repairing of the entire housing or
internal parts. In this case, it is necessary to: remove caps and inject the grease, using grease
pump, into hole H until the grease comes out of hole K. Then screw caps back into place on
housing.
B = Each time the Cardan shaft is disconnected and Whenever the machine is stopped, we
recommended that you clean the power takeoff shaft and replace the protective cover.
C = Each time the machine is connected to the tractor.
# Additives of a type permitted by anti-pollution regulations.