8
DELIVERY AND ASSEMBLY
Checking the machine on delivery
All parts are carefully checked before dispatch or delivery.
On receiving the machine, ensure that it has not been damaged during transport. If damage has
occurred, contact the dealer concerned.
Details of packing are given below.
UNPACKING THE MACHINE
Lift the machine using a forklift truck, crane or other suitable equipment of sufficient capacity after
first checking the weight of the configurations in the table given below.
Check the stability and positioning of the load on the forklift truck forks or crane hook.
Keep the load as low as possible during movement for maximum stability and to ensure that the
operator has maximum visibility.
If a forklift truck is used, ensure that the forks are positioned as wide apart as possible.
WEIGHT PACKING
WEIGHT
KG
1250
1120
LBS
2750
2470
NOTE:
1) The packing consists mainly of wood, which should be disposed of according to the laws
in force in the country where the machine is used.
The plastic film should also be disposed of according to the laws in force in the country
where the machine is used.
2) When storing, it is permissible to stack 2-3 crates on top of each other. Make sure that
they are perfectly aligned cortically.
3) In the event of further transport, ensure that the machine when on the transporting
vehicle.