Multi 45 300 x 280cm
6488834
1
General tips and refers to:
The packaging foil
can be used
to keep moisture out of the house. It is laid according to the ground area of the
house under the main bearing.
Given that the roof is constantly exposed to the weather, a covering with only one layer of roofing paper will not
be enough over the long-term. An additional covering with bitumen shingles, alternatively with a material of at
least equivalent quality, must follow.
Foundation according to the structural calculations
(not included in the scope of delivery):
concrete C25/30,
each 2 Ø 12 top and bottom, brace mat R188A (alternatively brace Ø 6/20cm). Anchoring of the floor beams
(in the building)
on the strip foundation using bolts M12, e < 60cm. The base bearings in the storeroom of the
house must be entirely flush.
The thread rods to secure the house against storm are secured at the top with a washer and a nut, from below
with a washer, spring and nut to tighten the upper nut of the thread rod without any problem, the spring at the
bottom should be pressed upwards with the thread rod.
The spring may only be tightened slightly
so that the
house can work at the top. The
projecting ends of the thread rods have to be cut off at the top
. Even after
the house has been completed, attention must always be paid to the fact that the thread rods are not seated on
the floor as otherwise when it is dry, gaps can arise and the roof is pressed upwards.
Tip:
the thread rods can also be pushed subsequently into the bores. You have to make sure that
each plank
has a bore
and that these are free and
not blocked by shavings or similar
.
In case of varying weather conditions, the wood alters in height (due to 'working'). To avoid the formation of joints,
the planks of the house may not, for example, be joined
to one another through several block planks
as then
the wood can no longer expand.
Please note, that the screw with the washer has to fasten on the top of the longholes in the strip for connecting
the planks together. It is important, that the screws can move a little bit and the roof doesn´ t come into contact
with these connecting strips; otherwise you have to cut these strips on the bottom. Please don´t screw too tight.
The
door frame
may not be
firmly joined to the wall planks
as the wood works at the top. If the door
cannot be
closed properly
, this can be adjusted by
turning the hinges
.
In the case of instable soil, it is recommendable to lay a piece of path slab or a wall block around the posts
to prevent
sinking
(not included in the scope of delivery).
-
-
-
-
-
-
-
1
1
2
3
4
2
5
Important information
Please check the construction set for completeness using the position list in good time before starting con-
struction or commissioning your construction team.
If individual parts are defective or missing, we will deliver
these as quickly as possible. However, we cannot refund the costs for any resulting construction delays to a
construction company.
Please understand that we cannot assume any guarantee for the following defects:
- incorrect storage before assembly
- incorrect anchoring with the ground or inadequate foundation (foundation according to statics)
- damage due to erection errors, e. g. the house is not level or not right-angled
- damage through a higher level of snow burden than statically envisaged. Recommendation: lad relief of
the roof by removing the snow layer
- storm damage (insurance cases) or violent destruction
- damage through any alteration to the design by the client
- natural formation of cracks, branch holes, twisting, decolouration or similar modification (natural
process; has no influence on the statics)
Storage information until construction
:
- store pallet on a level and dry surface.
- Protect from exposure to sunlight and the influences of weather; wood can warp drastically in a loose
condition!
Maintenance tips:
The wood is untreated. Accordingly, regular, protective coating is absolutely necessary!
Please observe the attached information sheet “Care instructions/Colour treatment”.
© SKAN HOLZ Europe GmbH D-21227 Bendestorf. Technical modifications reserved. All dimensions are approximate dimensions. 10/2017