Installation Instructions
Pump P 215
810-55192-1
Page 16 / 45
Rev. 012
2018/11/30
2.25.
Briefing of external technicians
Prior to commencing the activities, external technicians must be informed by the
operator of the company safety provisions, the applicable accident prevention
regulations to be maintained, and the functions of the superordinate machine and
its protective devices.
2.26.
Provision of personal protective equipment
The operator must provide suitable personal protective equipment for the
respective location of operation and the purpose of operation.
2.27.
Training courses
In order to provide a maximum of safety and economic viability, SKF carries out
detailed training courses.
It is recommended that the training courses are attended. Please contact SKF
Customer Services for information.
2.28.
Inspection of the delivery
The delivery must be inspected for completeness based on the delivery papers.
Transport damages must be reported to the forwarder immediately. The packaging
material should be stored until any inconsistencies have been clarified.
2.29.
Returns
All parts must be cleaned and correctly packed prior to being returned. Returned
goods are to be marked as follows on the packaging:
Do not apply any load / This side up
Protect against moisture
Handle with care! Fragile, do not throw!
2.30.
Disposal
At the end of its service lifetime, the pump must be dismantled correctly and
disposed of according to the respective valid provisions.
It is forbidden to use parts of a pump which is to be disposed of or to assemble
these parts to make a new pump.
Summary of Contents for Lincoln 215-M049
Page 1: ...Installation Instructions Pump P 215 810 55192 1 Page 1 45 Rev 012 2018 11 30 P 215...