Sky Climber
ZEABORN GUIDELINES
18.11.2020 Version 1
- Page 11
-
Figure 1.1
1.10.3 Cover each Hoist, Sky Lock and wire winder with protective covers made out of insulating
material.
1.10.4 Connect a ground conductor from the platform to the work piece. The size of this conductor
shall be equal to, or greater than the size of the stinger lead.
NOTE : This must be a secondary conductor and shall not be in series with the primary
conductor between the welder and the workpiece.
1.11 CORROSIVE ATMOSPHERE
When Sky Climber hoists are being used in corrosive work-associated atmospheres such as acid
washing, the hoist and its supporting steel wire rope shall be protected from direct contact with the
corrosive solutions and agents. Each day, on the final descent, the steel wire rope shall be washed with
a neutralizing solution and relubricated. Stainless steel wire rope, which is far more resistant to corrosion
deterioration can be obtained from Sky Climber.
Daily examination of the full supporting length of wire rope is mandatory.
1.12 SAFETY LABELS / INSTRUCTIONS
The Sky Climber equipment shall be labelled as follows :
Use only
8
mm SKY CLIMBER Steel wire rope
with a min. actual breaking load of 40 kN
(or better)
COMPACT CX 500
Manufactured by :
SKY CLIMBER EUROPE N.V.
Boomsesteenweg 14
B-2630
Aartselaar
BELGIUM