KY CLIMBER
19
®
CHECK LISTS
SKY STAGE ULTRA®
EE36004
ED 2018.08.03
Always wear personal fall protection equipment.
Verify if all warning decals and rating labels are in place and legible
Verify if provisions are made to protect workers from falling objects above and below
equipment.
Check Lists
Inspection prior to installation
Operating instructions are kept with stage at all times
Reject & replace parts when the following failures are noticed:
Cracked or torn welds.
Cracked or torn material.
Deformations that could endanger the structural strength.
Deformations that would not allow normal installation.
Deformed or cracked connecting holes.
Damaged, missing or ilegible decals indicating load ratings, configurations etc.
Check components prior to shipment
Use table Standard configurations & Assembly Parts in this user manual to verify to correct
amount of parts prior to shipment. Ensure all decals and/or nameplates are in place and
legible.
Inspection after installation
Inspect the platform assembly after installation and prior to each workshift:
Verify load rating per this manual or decals and verify this load will not be exceeded
Verify if all connections have a Connecting Pin assy:
Side Panel:
4 Connecting Pin assys
Top Rail:
2 Connecting Pin assys
Telescopic Post:
1 Connecting Pin assy
Verify if each Connecting Pin is secured with a Locking Clip.
Side Panel:
4 Connecting Pin assys
Top Rail:
2 Connecting Pin assys
Telescopic Post:
1 Connecting Pin assy
Verify if each End Stirrup has 2 secured Locking Clips or connecting Rod.
Verify if Wall Roller assemblies are tightened.
Verify if floor retainer Tabs & Blocks are extended: 4 per Floor Panel.
Verify if stirrups are in line with the roof supports.