MOSQUITO 3D PRO - INSTRUCTION MANUAL
page -8-
MOSQUITO 3D PRO --- MOSQUITO
3D PRO --- MOSQUITO 3D PRO
MOSQUITO 3D PRO --- MOSQUI
TO 3D PRO --- MOSQUITO 3D PRO
STEP 11 - Upper main frame - open BAG 10
STEP 12 - Main axis - open BAG 11
STEP 13 - Mount tail boom
Mount the motor support (52) to the up-
per main frame (55) with two screws.
Then mount the swashplate support (51)
and the upper bearing (54A) to the servo
support (50). Mount the middle bearing
(54B) into the servo support (50). After-
wards mount the preassembled servo
support (50) with three screws to the up-
per main frame (55). Finally mount the
two belt guide rollers (53) and the
bearings (XX) by using screw lock
glue as shown to the upper main fra-
me (50).
Mount the main gear holder (59) to the
main gear (60) with three screws. Mount
the inner spacer (61) and one way bea-
ring (62) into the main gear holder (59).
Afterwards mount the complete main
gear by using the main axis bolt (63) to
the main axis (56). Mount the belt gear
(57) to the main axis (56) using another
main axis bolt (58). Finally mount the main
axis to the preassembled lower body from
step 6.
Align the preassembled tail boom from
step 10 and the belt onto the main axis. In
the next step the tail boom will be scre-
wed to the main frame so make sure that
the belt is not twisted inside the tail boom
and that main and tail rotor rotating di-
rections are correct.