CONTRACT 4
Annual 'health check' service plus emergency call out within 2 working days
one site visit by engineer to undertake:
calibration / operation check and fit new batteries for DataHog datalogger
Recalibration of 1 sensor annually (for example RH sensor)
Recalibration of 1 sensor biennially (for example solar radiation sensor)
Clean radiation screen to ensure free air flow over sensors
Clean and fit spares and new filter to raingauge
Check total system for integrity
One emergency call out visit within 2 working days
Full telephone support
CONTRACT 5
Biennial or Triennial 'health check' service of WindHog System
one site visit by engineer to undertake:
calibration / operation check of WindHog system
Replacement of Lid Gasket and Gel pack in DataHog2 and Remote Signal
Booster
Replacement of Wind Speed Sensor Bearings (years 2, 4 & 6)
Replacement of Wind Vane Bearings (years 2, 4 & 6)
and Potentiometer (year 6 or year 8)
Clean system (each visit)
Check total system for integrity (each visit)
Full telephone support all year
PLEASE NOTE:
For all maintenance contracts repairs outside manufacturers warranty terms
and conditions and any additional call out visits charged at cost.
38
MiniMet Installation
Summary of Contents for MiniMet
Page 1: ...MiniMet Installation Manual Iss 2 0...
Page 45: ...APPENDIX 2 CONCRETE BASE FOR A 2M MAST 44 MiniMet Installation...
Page 46: ...APPENDIX 3 SITE LOCATION 45 MiniMet Installation...
Page 47: ...APPENDIX 4 ASSEMBLY OF MAST SUPPLIED IN MORE THAN ONE SECTION 46 MiniMet Installation...
Page 49: ...APPENDIX 6 RAINGAUGE BASEPLATE 48 MiniMet Installation...
Page 50: ...APPENDIX 7 MOUNTING OF GSM GPRS ENCLOSURE TO BRACKET 49 MiniMet Installation...
Page 51: ...APPENDIX 8 MOUNTING THE GSM GPRS MODULE ON THE MAST NO SOLAR PANEL 50 MiniMet Installation...
Page 55: ...APPENDIX 12 TYPICAL MINIMET INSTALLATION WITH GSM GPRS 54 MiniMet Installation...
Page 56: ...APPENDIX 13 TYPICAL MINIMET INSTALLATION WITHOUT GSM GPRS 55 MiniMet Installation...
Page 57: ...APPENDIX 14 56 MiniMet Installation...
Page 58: ...APPENDIX 15 FITTING THE BATTERY COVER 57 MiniMet Installation...