Page 40
December 2007
SJ 46AJ
It is the responsibility of the operator to read, completely understand and follow all instructions and warnings
contained in this operating manual and on the aerial platform.
FAMILIARIZA
TION
FAMILIARIZA
TION
2.5 Winching and Towing Procedure
This section provides the operator with procedure about
winching and towing and on how to manually release
brakes.
WARNING
Ensure boom is in stowed position before
winching or towing. Sudden motion could
cause aerial platform to become unstable.
Death or serious injury could result.
WARNING
In emergency situations where aerial
platform functions are not available and
lowering is impeded by an obstacle,
utmost care must be taken to move
aerial platform far enough to clear
obstacle. In such cases, operation must
be extremely smooth with no sudden
movements and must not exceed a speed
of 2 in./sec (50 mm/sec).
WARNING
When pushing, winching or towing, do
not exceed 2 mph (3.2 km/h).
WARNING
Do not winch or tow aerial platform on
grade steeper than 45% (4WD).
WARNING
Do not winch or tow aerial platform onto a
slope, or brake the towing vehicle rapidly.
Do not pull aerial platform down an incline
towards a winch.
1.
Before winching or towing aerial platform, fully
retract, lower and position boom over rear drive
wheels in line with direction of travel.
2.
Manually release brakes (refer to
).
3.
Remove wheel chocks or blocks, and then winch
or tow aerial platform to desired location.
4.
Position aerial platform on a firm and level
surface.
5.
Chock or block wheels to prevent aerial platform
from rolling.
6.
Apply brakes by pulling out black brake auto reset
valve.
NOTE
Brakes automatically apply when platform
controls are engaged.
WARNING
Brakes must be applied immediately after
reaching desired location.
Procedures
Section 2 - Familiarization
Summary of Contents for SJ 46AJ
Page 1: ...ARTICULATING BOOMS MODELS SJ46AJ 169510AD A November 2015 OPERATING MANUAL ANSI CSA ...
Page 12: ...Page 12 December 2007 SJ 46AJ Notes ...
Page 62: ...Page 62 December 2007 SJ 46AJ Notes ...
Page 92: ...Page 92 December 2007 SJ 46AJ Notes ...
Page 94: ...www skyjack com Pålitelig lift løsninger av folk som bryr seg ...