55
SJ30 AJE SJ30 ARJE
213213AAA
Operator’s Checklist
Section 4 – Pre-operation
4.4 Operator’s Checklist
NOTE:
Make a copy of this page or visit the Skyjack website at
www.skyjack.com
for a printable copy.
N/A
P
F
R
Main and Fly booms
Optional equipment/attachments
Work light (if equipped)
Flashing amber light (if equipped)
Inverter (if equipped)
Pipe rack (if equipped)
Control box cover (if equipped)
Air line (if equipped)
Function Tests
Testing main power connectors
Base control console
Testing base emergency stop light and base
emergency stop button
Testing function enable switch and all boom
functions
Testing platform self-leveling
Testing emergency power
Testing base/off/platform switch
Platform control console
Testing secondary guarding electrical (SGE)
Testing platform emergency stop light and
platform emergency stop button
Testing footswitch
Testing steering
Testing driving function
Testing driving speed
Verifying load sensing module self-check
Testing emergency power
Testing horn
Testing brakes
Testing manual platform leveling
1417AA
N/A
P
F
R
Visual and Daily Maintenance Inspections
Labels
Electrical
Limit switches
Hydraulic
Base
Main power connectors
Torque hubs
Steer cylinder assembly
Tie rod
Wheel/Tire assembly
Battery trays
Batteries
Battery charger
Pothole protection
Control compartment
Base control console
Main manifold
Motor/Hydraulic compartment
Hydraulic fi lter
Hydraulic pump/motor
Hydraulic tank
Hydraulic oil
Emergency power unit
Turret rotation motor/gear
Platform assembly
Platform control console
Manuals
Boom assembly
Rotary actuator
Jib (non-rotating/rotating)
E-chain
Riser
Cylinders
Wear pads
Serial Number:
Model:
Hourmeter Reading:
Date:
Time:
R
REPAIRED
N/A
NOT APPLICABLE
Operator’s Name
(Printed):
Operator’s Signature:
Each item shall be inspected using the appropriate section
of the Skyjack operating manual. As each item is inspected,
check the appropriate box.
Operator’s Checklist
P
PASS
F
FAIL
To
order
go
to
Discount-Equipment.com