01/11/2017
13/36
E_MH_Mounting_instructions_Skylux_Climalux
Climalux
®
Installation tips
Posts
Determine the length of the posts (HN + HG) in function of the slope and the position of the wall profile (HM).
Post for gutter GX
accessories for corner post
accessories for middle post
Base plate PV (optional) and U-shaped bracket
U-bracket
Post PX 110/141
Post for gutter rafter GDX
(for roof with overhang)
Post PGDX 110/110 for gutter rafter GDX
Bolt the U-bracket to the PV base plates (fig A) using the BMR screw set (fig B) for the corner posts. Determine
the position of the PV base plates as indicated on page 7 and anchor these on a solid foundation in concrete using
the suitable fixing accessories (not supplied). Position the U-bracket correctly on the base plate and fix it. The
U-bracket for the middle posts can be installed without a base plate directly on a solid basis. Position the posts
over the brackets. Position these perpendicularly (level) and shore these temporarily to ensure they do not fall
over. The top part of all posts must be completely aligned and level.
Fig.
A
Fig.
B
110
141
PU
PV
(optional)
PU
110
110
PUX
PV
PUX
52
300
300
127,5
253,5
253,5
PV
BMR
not supplied