E_MH_Installation_instructions_Skylux_Climax
20/11/2020
66/88
Finish
GUTTER GD2
max. 80
Y16P
GD2C
Y16P
GD2
click
Gutter support GD2 is finished with GD2C. The GD2C
must be cut lengthwise to max 80 mm, up to the
thermal break of the window profile which comes
underneath the gutter profile. The length of GD2C
matches the distance between the walls and/or posts.
For window profiles > 80 cm (for example, sliding
doors) the length of GD2C must be cut at a length
equal to the distance between the walls and/or posts.
The GDP thermal bridge must be cut at a length
equal to the distance between the walls and/or posts.
Remove the adhesive strips Position the GDP against
the bottom side of the gutter support as indicated.
Y16P
GDP
Add SG20 silicone adhesive over the complete length
of the ribbed zone. Free the ends of the adhesive strip
and fold these outwards.
For window profiles up to 80 mm: clip the detail of the
GD2C in plastic profile Y16P. Once it is in the correct
position, free the adhesive strip completely and push
the GD2C against the gutter. Make sure the GD2C
profile does not exceed the thermal break of the
window profile.
GD2C
self-adhesive
strip
SG20