E_MH_Instalation_instructions_Skylux_Climax_Panorama
20/11/2020
22/60
Gutter
Multiple gutter combination options are possible with regard to the load and the required span. Use the load graphs on pages 47 - 51
or calculate using the Climafast calculation application:
Gutter combination
GDG + GDGL
The opening of the LED profile GDGL must face downwards if you want to add the LED lighting to the GDG gutter. Specific instal-
lation tips are provided on page 54.
G
utter combination with reinforcement profile
GDG + IPE120* + GDGK
Shorten the gutter combination by 10 mm if the gutter combination is to be installed between two walls. The 5 mm clearance on each
side is required for the installation of the slide ends.
Pre-drilling is required to install the U-brackets if the gutter is reinforced with a steel profile. The use of strong self-drilling screws is
recommended. If the Statik installation set is used, you have to foresee screw thread M10 (4x) in the reinforcement profile.
* Reinforcement profile IPE 120 is not supplied. It can be bought at any local hardware shop.
We recommend treating the reinforcement profiles with an anti-corrosion product.