114
Nynja Build Manual 1.4d
f) Rivet the small aluminium strips, located on the top of the
SKR37
tube
attachments at the tip and the jury strut locations, onto the top of the leading
edge tube, pointing towards the wing root.
Use 4mm aluminium rivets. Rivet on just behind the centre of the
leading edge tubes otherwise they can press into the covering levinga
small but annoying bump! These plates hold the brackets and tubes
from turning.
Use another round
SKR37
tube to join the leading and trailing edges at
the lift strut location.
Don’t forget to attach the bracing cables at the lift strut ends: the one
with the turnbuckle to the trailing edge, using the end without the
turnbuckle; and the one without the turnbuckle to the leading edge.
Note the altered arrangement of the aileron pulleys, Figure 138. A
spacer tube has been incorporated between the top and bottom parts of
the U-bracket, with the lower pulley bracket held between the spacer
and the upper part of the U-bracket. The upper pulley sits on top of the
U-bracket, with a thin plastic washer between it and the bracket.
Leave the bolt securing the pulleys loose at this stage, to allow the
aileron cables to be passed through later.
Figure 137 lift strut attachments.
Figure 138 UKMOD aileron pulleys.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...