x) Tension the fabric to the point that you see the compression tube bowing,
Figure 160.
There should be around a 4cm gap between the compression tube and
the vertical wing tensioning tubes.
This should result in the bow in the compression tube being no more
than the diameter of the compression tube. You can check by placing a
straight edge along the compression tube and measuring the space in
between.
y) Check that the cables in the wing are still taught, tighten if necessary, then
secure the turnbuckle with safety wire.
z) Use the rope that you have attached to the leading edge of the fabric to pull
the fabric tight in the same manner as before.
Look for the wrinkles just near the leading edge-root section of the
wing. Tension the fabric with the rope until you see these wrinkles pull
out. This will require a good firm pull.
aa) Whilst holding the tension on drill a hole through the centre of the grommet
and secure the fabric in place with a 4mm or larger steel rivet and a washer.
Alternatively a stainless steel countersunk screw can be used.
Remove the string before the final rivet pull or screw turn.
bb) Leave a nut on the end of the threaded tensioning rods and cut off the
remaining thread, then finish nicely with a file.
cc) Measure the distance from the fabric to the end of the leading edge and make
both wings the same, otherwise it will look odd when aligned with the cabin
doors.
A typical measurement is around 44cm.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...