178
Nynja Build Manual 1.4d
throttle arm and tube 14. We extended by around 20mm. Offer up the binnacle
mouldings to see the limit of this adjustment.
Figure 239 Instrument panel lower fixing, and instrument panel upper fixing (note - pics are of a
Swift2 so firewall detail different)
f) Trim as required and fit the triangular dash top panel as shown below. Fix it at
the front using the 4mm bolt and nut through A and B, and again with a 4mm
nut and bolt mid point of B.
Figure 240 triangular dash top panel
g) Offer up the dash binnacle mouldings.
Trim to fit snugly, but allow some room against the firewall for coverings. Cut
the top to parallel the edges of the Triangular dash top as shown below.
Overlap by around 25mm. It will also need cutting to allow for the dual throttle
torque tube.
h) When happy with the fit mark up and drill the securing holes. Use the 4mm
clipnuts (or rivuts) over the securing angles and the edges of the triangular
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...