215
Nynja Build manual 1.4d
e) When happy with the positioning trim the forward tube end to fit
Trim it to match the vertical line of the hinge
Figure 294 front end of lower door tube
– shown with door open.
f) The rear upper end should be trimmed to fit below the top tube. Offer up the
rear gusset plate as a guide to where to cut the tube to fit.
Figure 295 rear gusset plate and rear end of lower door.
g) Drill the front end of the tube and hinge and secure with a cleco / skinpin.
Make sure the tube is in exactly the correct position before drilling and
not rotated out of alignment with the opening.
h) The top tube must next be trimmed to fit.
It is imporatnt that the outwards bend matches the position of the bend
in the upper door frame. Get this now and tap it in position so that this
can be ascertained and the tube trimmed to fit accordingly.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...