240
Nynja Build manual 1.4d
b) The spats will have to be cut away to clear the undercarriage leg
Again note that the spats fit over the brake callipers.
c) Remove the standard wheel retaining tubes and fit the wheel retaining
extension tubes from the spat kit.
They are supplied drilled at one end
– this is the end the aluminium
angles fit. Attach with the M5x20 bolt supplied. The retaining tube
should be drilled to suit where it attaches to the axle, so that the wheel
is retained with no play along the axle.
Figure 335 spat brackets.
d) Fit the spats and secure them with M5 bolts with Nylon washers under the
heads to protect the fibreglass.
Three bolts secure each spat, two on the inside and one on the outside.
Figure 336 spat, showing outer mount bolt.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...