33
Nynja Build Manual 1.4d
2.5 Rear Cabin Frame
2.5.1 Preparing the rear cabin uprights.
Figure 27 rear cabin uprights and correct handing for attachment of SKR2 fuselage longerons
a) Fix the steel U-brackets for the trailing-edges with the taper downwards, using
an aluminium saddle washer under each, against the rear cabin uprights
SKR6.
The rear cabin uprights
SKR6
have inner sleeves at their upper end,
and are handed in that the holes that connect the upper rear fuselage
longerons TU2 should be angled for the tailcone taper.
The nuts may foul the upper rear cabin cross-piece
SKR7
, in this case
file away a little from the TU7 to provide clearance.
A spacer should be used on the bolt inside the tube.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...