Step 17
Now place the line bundles in the
designated line pocket inside the
reserve container.
Step 18
Secure the fourth and final
rescue flap with the remaining
line length from step 16.
The Rescue system is now
packed !
Step 15
Now close the first three rescue
flaps and secure them with a small
line loop. This method will avo-
id burns from a deployment later
since the bundle of lines will be
released first and will not come in
contact with the material.
Step 16
Starting at the main riser, loop
the line bundles in the shape of a
figure-eight. Make sure to leave
approx. 40 cm free to the first fi-
gure-eight. This length is needed
for the final line loop.
EN
Packing Manual
37
36
Packing Manual