8
STEP 4
STEP 5
STEP 6
Uncoil input Power Cord (connected to
Control Box’s power port) and plug into
Power Supply.
Locate the Power Down Box and install (2) 9 Volt batteries
(not included).
Uncoil the Power Cord and connect to the
Power Supply. Place Power Supply on the
ground and extend from the base. Ensure
that the Power Supply and all attached
cords are directed toward the desired surge
protector.
To sync two bases see detailed installation
instructions on page 16.
Always use two people when setting up the base.
STEP 1
STEP 2
STEP 3
Place the bed base box in a desired location with the top of
the box facing up.
Remove the binding straps and packing materials, making
sure not to puncture the box with any sharp objects.
Remove the bed base from the box keeping the bottom of the
base facing upwards.
To install the legs, thread the
washer over the bolt of the leg
with the recessed side facing the
leg, and tighten by hand.
Do not over tighten.
Installation Guide