SET UP YOUR 2019 SST
Inflate kite to 8PSI (6PSI for warmer climates).
Unwind lines and straighten out as usual, double-checking that
they are laid out properly and not twisted.
Connect outside lines to attachment points on trailing edge
(back) of kite, matching red to red and white to white.
(lines C and D at right)
Assure bridal is straight and untwisted, then connect inside lines
to connection points on bridal.
(Lines A and B at right)
Before launching, it’s always a good idea to double-check your
lines to make sure they’re connected properly.
A
C
D
B
Summary of Contents for 2019 SST
Page 1: ...2019 SST QUICK START GUIDE...
Page 8: ......