10.2.3.4 Sunny Central
Required maintenance materials and tools:
☐ A suitable water-free, heat-resistant lubricant
☐ A testing device approved by the manufacturer of the AC disconnection unit, e.g. TT1 by ABB
☐ Talcum, petroleum jelly or wax for maintaining the seals
☐ Use touch-up sticks, paint brushes, cans of spray paint or 2K-PUR acrylic paint in the appropriate RAL color to
repair small-area surface damage.
☐ Use touch-up paint or 2K-PUR acrylic paint in the appropriate RAL color to repair large-area surface damage.
☐ Abrasive cloth
☐ Degreaser
☐ A surge arrester testing device approved by the manufacturer of the surge arrester such as the PM20 by
DEHN + SÖHNE GmbH + Co. KG
Maintenance work depending on the condition of the inverter
Maintenance with DC voltage present
Task
See
Reading off error messages and warnings
Checking the AC disconnection unit
Maintenance under voltage-free conditions
Task
See
Performing an optical inspection
Cleaning the ventilation plate
Cleaning the air duct and ventilation grids
Checking the interior
Checking the fuses/disconnection blades
Checking the bolted connections
Checking the surge arrester
Checking the labels
Checking the inverter surface
Maintenance work with supply voltage present
Task
See
Checking the fans
Checking the heating element and the hygrostat
Checking the Function of the UPS
10 Maintenance
SMA Solar Technology AG
System Manual
137
MVPS22JP-SH-en-11
Summary of Contents for 1000-1SC
Page 257: ......